5 YEARLY STEAM TURBINE INSPECTION

HUTEC Capabilities
Steam Turbine Inspection
2017 5 YEARLY STEAM TURBINE INSPECTION

Hutec Engineering completed a 5 yearly major inspection of a 6.5Mw Siemens steam turbine.  Both the Turbine and Generator were completely disassembled for the inspections.A big Thank You to Progressive Engineering who manufactured the specialist onsite machining equipment required for the casing and the manufacture of the casing bolts and nuts.​Hutec Group would like to thank all involved in the project.