Back

BIOLUMA INSTALL FOR CHH WOOD PRODUCTS

1000 hours
4 Days
HUTEC Capabilities
Wood Product Engineering
2017 Bioluma Install for CHH Wood Products
  • Manufacture of assemblies and structures for install.
  • 3D modelling of complete processing line to determine new equipment and modifications required to fit new equipment and streamline the install process.
  • 1000 hrs of install effort condensed into 4 days.
  • Dozens of parts manufactured, including shafts, rolls, tensioning equipment, sprockets, chutes and complete end docking saw assembly.
  • End to end process managed, designed, constructed and resourced by Hutec Engineering.

Other Projects